Kitchen Renovation in UAE: What to Expect and How Much to Budget

A kitchen renovation is the most sequence-dependent job in a UAE home. Cabinetry is manufactured off site, stone is templated after the cabinets are in, and the sink and hob cannot be connected until the worktop is fitted. Get the order wrong and the project sits idle for three weeks.

Get Free Quotes
Written for UAE homeownersVerified contractor marketplace

What a kitchen costs in the UAE

A budget kitchen with a like-for-like cabinet swap and laminate or entry-level quartz worktops costs AED 20,000 to AED 35,000. Mid-range, with new cabinetry, better hardware, stone worktops and appliance integration, runs AED 35,000 to AED 70,000. Premium kitchens with handleless or veneer joinery, book-matched stone and an island reach AED 70,000 to AED 150,000.

Linear metres of cabinetry and the worktop material drive the price more than anything else. Appliances are usually the largest single line if you are replacing them.

Cabinetry: the decision that lasts longest

Ask what board the carcass is made from. Marine ply or moisture-resistant MDF with sealed edges survives UAE humidity; unsealed particleboard swells at the sink and dishwasher within a season. Doors can be laminate, acrylic, veneer or lacquered MDF, and the finish matters as much as the board.

Hardware is where cheap kitchens fail. Hinges and drawer runners from a known brand, rated for the door weight, cost more and last far longer than generic alternatives. Ask for the brand name in the quote.

Worktops that cope with UAE cooking

Quartz and sintered stone are the practical choice: they resist staining and do not etch from lemon juice or vinegar. Polished marble looks better but dulls and stains on a daily-cooking surface, so reserve it for an island or splashback if you love the look.

Stone is templated after the base cabinets are installed and levelled, not before. That two to five day gap is normal and should be in the programme.

The sequencing that avoids delays

Run the job in this order and you avoid the most common stalls.

  • Final design and site measurement, one to two weeks
  • Strip out, electrical and plumbing first fixes
  • Plastering, screed and ceiling works
  • Cabinetry manufacture in parallel with site works
  • Cabinetry installation and levelling
  • Stone templating, then fabrication, then fitting
  • Sink, hob, extractor and appliance connection
  • Silicone, snagging and handover

Extraction and ventilation

In an enclosed kitchen with heavy daily cooking, a ducted extractor is not optional. Recirculating hoods move air through a carbon filter and put moisture and grease back into the room, which is exactly what you do not want in a UAE summer when the AC is running.

Duct runs need a route to outside, and in apartments that route is often through a ceiling void to a shaft. Confirm the route before you buy the hood.