Bathroom renovation quotes in Dubai vary by more than 400 percent for what sounds like the same job, and the difference is rarely the tiles. It is demolition, waterproofing method, whether walls move, and how the contractor handles building management. This guide breaks the price down so you can compare quotes honestly.

Get Free Quotes
Written for UAE homeownersVerified contractor marketplace

The headline numbers for 2026

A standard second bathroom in a Dubai apartment costs AED 15,000 to AED 25,000. A main bathroom with better tiles, a walk-in shower and a wall-hung vanity lands between AED 25,000 and AED 50,000. Premium work with large-format stone, custom joinery and layout changes runs AED 50,000 to AED 120,000.

Those ranges assume the room stays in the same position. Moving a drain, soil stack or water supply means breaking concrete, re-testing waterproofing and reinstating the screed, which alone can add AED 6,000 to AED 15,000.

Where the money actually goes

A typical AED 35,000 Dubai bathroom breaks down roughly like this. Percentages matter more than the exact amounts, because they show you where to negotiate and where not to.

  • Demolition, protection and waste removal: 8 to 12 percent
  • Waterproofing, screed and drainage: 12 to 18 percent
  • Tiling and tile material: 20 to 30 percent
  • Sanitaryware, shower and taps: 15 to 25 percent
  • Electrical, extractor and lighting: 5 to 8 percent
  • Labour, supervision and making good: 15 to 20 percent

The four costs people forget

Building management deposits, lift protection and permitted working hours are a real line item in Dubai towers. Some buildings charge a refundable deposit of AED 1,000 to AED 5,000 and require a NOC from the landlord before work starts.

The second forgotten cost is making good outside the bathroom. Waterproofing and tiling rarely stop exactly at the door line, so expect threshold and skirting work. Third is the extractor: a windowless bathroom needs a properly ducted fan, not a recirculating unit. Fourth is the drying time, which is not a cost but is time you cannot use the room.

How to compare two quotes properly

Put both quotes side by side and check four things: the waterproofing specification (product name and number of coats), whether tile supply is included, how many coats of paint the ceiling gets, and whether the price includes the final silicone and snagging visit.

If one quote is dramatically cheaper, find out what was removed. Usually it is the tanking, the waste removal, or the making good after tiling.

Timeline to plan for

Strip out and waterproofing take three to four days, with 24 to 48 hours of curing before tiling. Tiling takes four to six days for a standard bathroom, then grouting, sanitaryware and silicone add another two to three days. Two to three weeks is a realistic total once materials are on site; imported tiles and stone can add a week of lead time.

Get quotes for this work

Ready to Get Quotes?

Submit one free request and compare written quotes from verified contractors in your emirate.

Get Free Quotes

Free to submit. No obligation. Verified, licensed contractors only.